Network Rail FLOW Bridge
UK
Client
Network Rail
Programme
2020 - ongoing
Design and Construction Team
Knight Architects, Epsilon Optics, FoFlo, Jacobs, KS Composites, Q-Railing, Rapid Root and Sui Generis
Awards
NCE TechFest Award 2021
Railway Innovation Award 2021
Composites UK Award 2021 (Runner-up)
Building Innovation Award 2021 (Shortlisted)
E&T Innovation Awards 2022 (Runner-up)
Architizer A+ Awards 2023 (Finalist)
Engineering and Manufacturing Awards 2023 (Shortlisted)
Offsite Awards 2023 (Shortlisted)
ICE West Midlands 2023
IStructE Structural Awards 2023 (Shortlisted)
National Rail Award 2023
Offsite Construction Awards 2023
ICE West Midlands 2023
British Construction Industry Awards 2023
New Civil Engineer Bridges Awards 2024
Challenging standard conventions through innovation
Knight Architects was appointed by Network Rail to develop an innovative new standard footbridge design as part of their drive to improve safety at level crossings. The brief sought to find an alternative to the heavy steel standard footbridge commonly used across the railway.
The project challenged the design team to deliver a user-focused crossing that was cheaper and quicker to produce than a steel equivalent, and adaptable to a range of locations. The team leveraged the properties and structural functions of modern composites, achieving a lightweight, strong and cost-effective concept solution. This in turn allowed the use of concrete free foundations.
Improvements to the bridge geometry and parapets create a radically enhanced user experience. A modular concept design was developed in fibre-reinforced polymers (FRP) using parametric modelling tools, which allowed for a highly collaborative process and real-time design evolution. The result is a standardised product which accurately reflects the concept, offering a variety of configurations to respond to different site characteristics. The concept included ramped and lift solutions, as well as stairs, and these are being developed for production in response to the popularity of the concept.
The innovative procurement process meant concept to completion of full-size prototype took less than a year and was achieved largely remotely. The Consortium are now progressing with the detailed design and fabrication for the Mark II Production version.
Share